Stage 3 · Engineering & Project Controls

Quality Management System

Planned

Activity-linked quality — integrated into Engineering & Project Controls — that hardens the project record from “physically done” to “quality-accepted.” Because quality metadata lives on each activity, inspections attach to the same spine as planning, DPR and measurement.

Planned — not started in production. This page describes the intended Stage-3 capability.

Capabilities

What the QMS will cover

  • Quality plansPlanned
  • ITP (Inspection & Test Plans)Planned
  • Method statementsPlanned
  • Material inspectionsPlanned
  • Work inspectionsPlanned
  • ChecklistsPlanned
  • Hold pointsPlanned
  • Witness pointsPlanned
  • TestsPlanned
  • NCR (Non-Conformance Reports)Planned
  • CAPA (Corrective & Preventive Action)Planned
  • SnaggingPlanned
  • HandoverPlanned
  • Quality audit trailPlanned
Available NowVerified as live in the current production baseline.
Under DevelopmentActively being built or completing productization.
PlannedApproved on the roadmap — no production claim.

Why it lives under Engineering

A hold-point inspection that passes is the gate that lets progress advance to measurement and billing. Keeping quality on the activity spine means an inspection references the same activity the DPR progressed and the measurement will bill.

Start with live progress monitoring today.

Book a DemoExplore TeksysDPR